GeneratedAt: 2026-10-05T21:20:37.9835502-05:00 System: Highway Window: 6h Model: AI Summary (gpt oss 20B) --- **[15:22] Highway Maintenance — Driveway & Blacktop Work** A team of highway crews worked along a driveway near a cemetery, coordinating the removal of loose material, grading of gravel, and placement of blacktop to restore road surface integrity while ensuring traffic could continue through the intersection. - **Location:** Cemetery driveway/Badger intersection (no specific street address provided). - **Units involved:** Several maintenance trucks (named “Dwayne,” “Osborne” and “Chad”), a white jeep that was temporarily halted, and an unspecified number of support vehicles for hauling gravel and blacktop. - **Timeline:** - **15:22** – Dispatch begins; crews coordinate material removal at the intersection. - **15:28–16:00** – Trucks dump gravel and blacktop at designated points (e.g., “point 18,” “to 34”). - **16:04–16:40** – Workers negotiate traffic flow, clear debris from a ditch in front of a barricade, and ensure the driveway remains passable. - **16:47–17:00** – Additional gravel is moved to fill gaps; crews confirm “10‑4” clearance after each load. - **17:04–17:12** – Final grading and dumping operations complete; crew departs the scene. - **Notable actions:** - Coordinated use of multiple trucks to prevent traffic congestion (“without getting in everybody’s way”). - Repeated confirmations (“10‑4”) after each material dump or clearing action. - No injuries, arrests, or hazardous materials reported. - **Outcome:** Driveway restored and cleared; intersection remained open throughout the operation.