GeneratedAt: 2026-10-01T17:08:52.9833601-05:00 System: Highway Window: 6h Model: AI Summary (gpt oss 20B) --- **[10/01 11:07] Construction – Stockpile North of 54** A multi‑unit crew coordinated the removal and delivery of inch‑and‑quarter concrete from a stockpile located north of Route 54 to an adjacent work site. The operation involved several trucks, on‑scene crew members, and coordination with additional units for loading, unloading, and safety compliance. - **Location:** Stockpile north of 54 (exact address not given). - **Units dispatched/responding/on‑scene:** Highway unit; crew members Pete, Dave, Pat, Doug, plus Truck 86 (mentioned later in the same activity). - **Priority level:** Priority 2 (announced at 12:45). - **Dispatch time:** 10/01 11:07. - **Arrival / transport details:** Crew expected to arrive within 5‑7 minutes (reported at 11:29); trucks were loaded with concrete and moved to the site; unloading directed by “David” (noted as the receiver). - **Status updates & coordination:** Repeated calls for timing (“I’ll be over in a little over five minutes”), instructions on where to dump (“West side”, “East side”, “bucket front”), safety reminders to stay away from digging areas, and coordination with other units (“Pat, bring your load back”). - **Additional notes:** Mentions of “20‑13” and various short traffic codes; reference to “Wetlands bridge” for a meet‑up point; references to truck “Truck 86” later in the sequence. No injuries, arrests, or fire alarms were reported.