GeneratedAt: 2026-07-22T09:03:56.3266992-05:00 System: Highway Window: 6h Model: AI Summary (gpt oss 20B) --- **[06:42] Highway Work — D Project** At the D project two units coordinated movement of a dozer and excavator while clearing vegetation, arranging grading direction, and concluding with a sweeping operation. The conversation included position updates, right‑of‑way instructions, and crew orientation changes. - **Location:** “D Project” (mentions of “phase” and “Pays” noted). - **Units involved:** - *Highway* – the channel’s primary operator(s); no specific designation recorded. - *Pushovers* – unit that departed at 08 40. - **Dispatch time:** 06 42. - **Arrival, transport or clear times:** none reported. - **Patient information:** none. - **Fire details:** none. **Incident updates:** - **06 42‑07 02** – Units confirm presence on the D project, coordinate right‑of‑way to a dozer, and acknowledge each other (“Thank you”). - **08 11** – “Better pile air” (unclear in transmission). - **08 12** – Grass piled between excavator and large dirt pile; repeated for emphasis. - **08 14** – Reference to grader: “Right in front of the grater. Height in front of the grader.” - **08 29** – Instruction to turn so crews face cutting direction, noted as improving efficiency; acknowledged with “Copy.” - **08 40** – *Pushovers* departs after completion of tasks (“thank you, bye”). - **08 49** – Transition to sweeping: operator states they are riding over and attempts to “get this wet so he can sweep and you can see what he's doing.” (unclear in transmission). No additional resources or unusual circumstances were reported.